Purpose built transport planning intelligence
Provide the project facts, technical inputs and professional decisions. TransportPlanAI assembles the evidence, builds the figures and tables, drafts the complete report and delivers it in your firm's Word format.
OSM · NaPTAN/BODS · DfT Stats19 · AADF · TEMPRO · planning policy
Technical analysis, modelling, professional judgement and sign-off remain with the planner.
20+ hours
Report-production time back to the planner
One complete report
TA, TS or Transport Note, assembled end to end
Grounded, not generic
Every claim traceable to the dataset it cites
The report is not the hard part
The analysis, the modelling and the judgement are yours, and they vary by scheme. Producing the report should not. TransportPlanAI writes from the information you supply, so a bigger scheme does not mean a longer document to assemble by hand.
The evidence base
How it works
One field, a pin on the map, your access points. That's the entire setup: no GIS, no shapefiles, no configuration.
INPUT · POSTCODE + ACCESS PINSStops and live timetables, five years of collisions, count points with growth factors, current planning policy: retrieved, cross-referenced and surfaced for review before anything is written.
OSM · NaPTAN/BODS · STATS19 · AADF · TEMPRO · POLICYHere: public transport accessibility, written from the pull (stops, frequencies, PTAL), citation by citation. Edit inline; nothing ships without you.
EVERY CLAIM TRACEABLE TO ITS DATASETUpload the firm's Word template once; every assessment renders into it: heading styles, figure numbering, footer intact. The deliverable is yours, in your name.
WORD-NATIVE · YOUR BRANDING · YOUR AUTHORSHIPIndependent challenge
A grounded review that checks every claim against the policy and data it cites, then returns a clear sign or revise verdict. Run it on a report you already have, or on everything TransportPlanAI drafts.
Path 1 · On demand
On your existing .docx
Upload a report you have already written and have it checked the same way.
Path 2 · Automatic
On a generated report
Runs the moment TransportPlanAI drafts a report, before you review it.
Peak bus-frequency statement is supported by the retrieved timetable evidence.
VERIFIEDA conclusion referenced a superseded parking-policy threshold. Supporting prose refreshed.
REMEDIATEDPlanner review requested for the residual network-effect conclusion.
REVIEWBuilt around the firm
Provide a completed TA or TS. TransportPlanAI extracts its heading hierarchy, maps each heading to stable transport-planning topics and asks the planner to approve the result. The approved profile becomes your firm default, with deliverable, locality, scheme and project-level overrides.
Beyond report generation
One project workspace for evidence gathering, report production, independent challenge and specialist assessments. It removes the repetitive work around the planner's technical decisions, without pretending to replace them.
Shared project data · Grounded outputs · Firm-branded deliverables
Pull the site's whole evidence base once: highways, DfT connectivity, public transport, collisions, policy and constraints.
Set the proposed assessment scope, record authority engagement and issue a Word scoping note.
Checks a completed draft against the evidence and policy it cites, then returns a grounded sign or revise verdict.
See how the local authority weighs transport in recent application and appeal decisions.
Compare proposed provision against local standards by use class, including EV provision.
Build indicative trip-generation estimates grounded in DfT National Travel Survey data.
Produce a full Travel Plan with mode-share targets, measures and a monitoring framework.
Work through a Stage 1 to 4 RSA checklist and return prioritised findings and an audit report.
Turn ARCADY, PICADY, JUNCTIONS 9 to 11 and LinSig capacity outputs into a grounded assessment report.
Model how sustainable-travel measures could shift mode share and trip generation across a scheme.
Track a rigid vehicle through the access and internal layout, with deterministic clearance and a reviewable export.
One project. A growing transport-planning toolset.
Planned next: Delivery & Servicing Plans · Construction Logistics Plans
TransportPlanAI replaces the repetitive third of the job, not the judgement third. The planner's name on the report still means something.
We're in pre-launch beta. Customer stories will land here once the first cohort has shipped TAs through their LPAs.
See the case-studies page (placeholder for now)8 site data pulls on your own sites: highways, public transport, collisions, policy and constraints. No card required. To see a full Transport Assessment drafted for your site, book a demo.